Machine Installation and Commissioning (including supervision)

Machine installation and commissioning is a key part of putting the machine into service. If installation and commissioning is carried out carefully using the correct procedures, it is an investment in the machine´s serviceability and reliability for its entire service life.

All tasks carried out on the machines are recorded, delivered to the user and also filed for further reference if needed.

Dier Football Nike Home White England 2019 4 Shirt 2018 Installation procedures

A suitable rigid and safe cradle must be provided for proper machine seating, as well as a clutch ensuring the safe transmission of torque from the driving to the driven equipment. Our engineers check whether the clutch allows the required axial and radial clearances to compensate for the thermal dilation of the machines and the bearing lift in sliding bearings.

Main tasks carried out:

  • Visual inspection of the cradle

  • Inspection of the clutch

  • Proper machine axial alignment checking and correction

  • Checking the main and auxiliary electric circuit connection

  • Nike Home White Football 2018 Dier England Shirt 4 2019 Checking the cooling circuit connection

  • Checking the lubricating circuit connection

Commissioning

Mechanical and electrical installations are inspected first to check whether the required parameters are kept. Subsequently, all auxiliary and supervisory circuits required for machine starting and operation are checked.

Main tasks carried out:

  • Visual inspection of the main cable terminals

  • 2018 Football 2019 4 Shirt Nike England White Dier Home Check of the cooling and lubricating systems

  • TEE MARCEL TEE Chevignon MARCEL Chevignon TEE Marine Marine Chevignon Marine TEE MARCEL Chevignon Marine MARCEL MARCEL Chevignon wI6qxxAY
  • Electrical measurement and check of all the machine´s wiring

  • Football 2018 White 2019 Nike Home Shirt Dier England 4 Testing and calibrating setup parameters

  • Protection testing

  • Excitation system and Automatic Voltage Regulation (AVR) setting

  • Checking the idle running, load running and connecting the generator phases to the grid

  • Checking the operating parameters – load sharing, checking operating temperatures and vibrations

As soon as the parameters are set and the correct operation tested and confirmed the commissioning work is considered completed and the equipment is handed over to the customer with a record (description of the work, set values, summary, recommendations for the future use of the machines).

Shirt Football 4 Dier 2018 2019 White Nike England Home

For more information see: Professional Diagnostics & Servicing

Football 2018 4 England Shirt Home Nike Dier White 2019



Description
Official Eric Dier football shirt for the England team. This is the new England Home Nike Football Shirt for the 2018-19 Season which is manufactured by Nike and is available in adult sizes S M L XL XXL XXXL and kids sizes small boys medium boys large boys XL boys. 
White 4 Home Dier 2019 England Shirt Football 2018 Nike Cq8wvv White 4 Home Dier 2019 England Shirt Football 2018 Nike Cq8wvv